# How to manage client feedback and revisions on a draft

> Work through five comments on a draft: corrections, conflicting instructions and an additional request. Keep feedback and decisions on their own version.

URL: https://reneva.app/en/blog/client-feedback-revisions/
Updated: 2026-11-03

To manage revisions, collect comments on **an identifiable version**, clarify conflicting instructions and agree any additional work before doing it. Then share the revised version and ask for a decision on that specific version.

Start with the work in front of the client: which file they are viewing, how it will be used and what it needs to achieve. “Make the date stand out” becomes more useful with a location and reason: “On the A4 poster, the event date is harder to read than the sponsor’s name.”

## Give comments a version and a specific location

Identify the file when sharing it, for example “Event poster, version 1”, and restate the agreed purpose: readers should be able to find the event title, date and location. Ask the client’s main contact to collect feedback from the people involved.

Each comment should identify the element, what needs correcting or clarifying, and the required result. Distinguish a requirement from a suggestion: “This is the approved event name” establishes a fact; “I would try a larger title” suggests a design choice. The [LMAO Graphic feedback guide](https://lmao-graphic.it/feedback-grafico-revisioni-chiare/) also distinguishes errors, comprehension problems, preferences and changes to the requested work.

## Five comments on a poster

The following case is **invented**. The assignment includes an A4 poster in Italian and a revision of the draft. The client has confirmed the correct event details; an English version is outside the agreed work.

| Point | Comment received | How to handle it |
| --- | --- | --- |
| 1, date | The correct date is 24 November, as shown in the confirmed programme. | Factual correction: replace the date. |
| 2, location | The street address is missing building number 12. | Text correction: complete the address. |
| 3, registration | The registration link needs to point to the approved form. | Correct the PDF link and check it by opening the destination. |
| 4, price | One person asks to remove the price; another asks to make it prominent. | Clarify with the main contact before changing the design. |
| 5, language | We also need the poster in English. | Additional request: agree content, timing and fee before starting. |

![Poster version 1: three confirmed edits to date, address and link; one price conflict resolved by the contact’s decision to keep it visible; an English version to agree as additional work.](https://reneva.app/assets/blog/revisioni-feedback-clienti/revisioni-feedback-clienti-classified-poster-comments.en.webp)

*Classifying feedback helps distinguish edits you can make from points that first need a decision or additional agreement.*

These are five points to handle, rather than five instructions ready to carry out. The first three have confirmed references; the fourth contains a conflict; the fifth changes the deliverable.

## Resolve conflicting instructions before editing

Send the main contact a specific question about the price: “For version 2, should I keep the price visible or remove it? I have received both instructions. Could you confirm which one to follow?”

In this example, the contact confirms that the price should stay visible. Record that decision against point 4 and apply it to the new draft. If the original comment was “make it more visible”, ask where it is difficult to notice and propose a change that fits the poster’s visual hierarchy.

The main contact gathers the client’s decision; you translate it into the design. If information is missing, keep that point open and make clear which other corrections you can already complete.

## Agree the additional language as separate work

For the English version, clarify who supplies or approves the translation, which files are needed and the required delivery date. Assess the layout alongside the content: different text may require changes to the available space.

Then propose timing and a fee for the addition, and keep the confirmation. If it is still undecided, keep that request separate from the Italian revision in progress. The client needs to understand what they will receive now and what still depends on a decision.

## Keep comments and decisions on their own version

In [Reneva Reviews](https://reneva.app/en/features/reviews.md), the client can comment on a file through a private link. A PDF comment can refer to a point on the page, and you can reply in the same comment conversation. This ties the feedback to the draft that prompted it, as shown in the [Guide to comments](https://reneva.app/en/guide/reviews/overview#comments).

After editing, **New version** adds the new file and keeps the previous one with its comments. Upload version 2 and summarise the decisions applied: date, address and link corrected; price kept visible; English version separate and still to be agreed. The [Guide section on versions](https://reneva.app/en/guide/reviews/overview#new-version) explains how to add the file.

![Version 1 and its comments keep their own context. Add version 2 with the changes applied and ask the client for a decision on it; check the other agreed work before final delivery.](https://reneva.app/assets/blog/revisioni-feedback-clienti/revisioni-feedback-clienti-comments-new-version.en.webp)

*A new version makes it clear what the client is assessing. Previous comments stay on the draft where they originated.*

Ask the client to check version 2 and approve it or request changes on that version. In Reneva, the decision stays with the version. **Resolve** and **Reopen** apply to the individual comment conversation: resolving a comment or approving a version leaves project status separate.

![In the poster example, comments stay on version 1 while version 2 gets its own decision. Resolve and Reopen apply to the conversation; approving a version or resolving a comment leaves project status separate. Check the other agreed activities before final delivery.](https://reneva.app/assets/blog/revisioni-feedback-clienti/revisioni-feedback-clienti-conversation-decision-status.en.webp)

*Check the conversation, decision on the draft and agreed project work separately. This helps you see what has been decided and what still needs completing.*

Before final delivery, check the approved version and the other activities included in the assignment, including production or publication if they form part of the agreed work.
